1. Acetylene producer autoclave tank repair in 2018 at Erdenet Mining Corp.
Acetylene producer autoclave tank repaired with surface blasting, cold bonding, and coating against corrosion in 2018 at Erdenet Mining Corp. Completed within shutdown of 7 days.
11. Molybdenum flotation tank surface coating at FLSmidth fabrication shop in UB in 2019.
Molybdenum flotation tank surface blasting and anticorrosive coating at FLSmidth fabrication shop in UB in 2019. the tanks installed at EMC concentrator in 2019. delivered in 5 days.